Child Missions
Child Missions
Section titled “Child Missions”A sufficiently complex WorkItem can become a child Mission. The child has its own Group, Coordinator, WorkItem graph, Memberships, budget, deadline, and approval policy. The parent WorkItem and child Mission retain stable links to each other (MWP-MSN-024).
A Child Mission is a Mission with its own lifecycle. It is not a WorkItem or an alternate display name for one.
Root Mission and Group└── parent WorkItem becomes blocked └── Child Mission and its own Group ├── child Coordinator ├── child WorkItems and Evidence └── child Approval └── result returns as Evidence and Artifacts for the parent WorkItemCreating a child Mission does not turn the parent Group into a nested chat room. The child receives a separate Group and shares only authorized summaries, Artifacts, Evidence, and stable links with its parent.
Authority and approval
Section titled “Authority and approval”The Parent Coordinator acts as the child MissionOwner and approves the child result on behalf of the parent WorkItem. Organization risk policy may add direct human approval. The approved child result becomes Evidence and Artifacts for the parent WorkItem.
The Parent Coordinator receives status changes, summaries, revised estimates, blockers, budget or policy escalations, and final results. It does not need every child Message, while retaining authorized on-demand inspection. The complete visibility boundary is MWP-MSN-026.
Scope narrows downward
Section titled “Scope narrows downward”The parent-child graph remains acyclic. A child’s budget, deadline, capabilities, data access, and permissions remain subsets of the parent. A default maximum depth requires explicit MissionOwner or policy approval when additional depth is justified (MWP-MSN-025).
This is the child-specific form of the general narrowing invariant in MWP-FND-020.
Failure and follow-up work
Section titled “Failure and follow-up work”A failed child Mission emits structured failure Evidence and affects the parent WorkItem according to its declared completion policy. The Parent Coordinator can replan, revise scope, create a replacement child, or cancel the branch.
- Use a child Mission to complete complex work inside an active parent Mission.
- Use a follow-up Mission for correction, remediation, or additional work after an approved Mission has become immutable.